US CELLULAR FACILITY
Merrimack, NH
|
|
 |
Fast-track construction on US Cellular’s medium-sized switching facility began during February, 2003.
This steel-framed building houses hi-tech equipment used for routing cellular phone calls throughout the Northeast.
The main switch room, switch room “A”, contains an expansive three-tier ladder rack cable management system,
protected by a state-of-the-art FM-200 fire suppression system.
The intense technical specifications of this project required intricate schedule maintenance to bring the project to completion within the required time frame of June 2003.
Owner: US Cellular
Architect: Kitchen & Associates
Project Manager: Justin Edgerly
Field Supervisor: Jon Cillo
|
|
|
|
|
|